Skip to content

Crane / self-propelled vehicles in Ontario

13 facts, each with the passage it comes from, all quoted from Guide to oversize/overweight vehicles and loads.

Where to apply

Where an application for Crane / self-propelled vehicles is submitted in Ontario.

  • Phone · Ministère des Transports

    Bureau de délivrance de permis, par téléphone

    416 246-7166

    Contact the permit issuing office during business hours if the route indicated on your permit needs to be changed.

  • Phone · Ministère des Transports

    Bureau de délivrance de permis, par téléphone (sans frais)

    1 800 387-7736

    Contact the permit issuing office during business hours if the route indicated on your permit needs to be changed.

  • Mail · Ontario Ministry of Transportation (MTO) Permit Issuing Office

    Permit Issuing Office, by mail

    301 St. Paul Street, 3rd Floor, St Catharines, Ontario, L2R 7R4

    Application forms must be completed in full. Incomplete applications will be returned.

  • In person · Ontario Ministry of Transportation (MTO) Permit Issuing Office

    Permit Issuing Office

    301 St. Paul Street, 3rd Floor, St Catharines, Ontario, L2R 7R4

  • Email · Ministry of Transportation

    Oversize/Overweight Permit Office, by email

    oo.permits@ontario.ca

    Use it when: For Permitting and Registration for International Registration Plan and Oversize/Overweight (PRIO) online permitting system account set up, tow truck certificate applications, special vehicle configuration permits or project permits

  • Fax · Ministry of Transportation

    Highway Operations Permits Office, by fax

    905-704-2545

    Use it when: Until January 1, 2026

    Download and complete an application form. Include payment (Canadian funds only) by visa or Mastercard using an authorization form, cheque made out to the Ministry of Finance, bank draft, money order or certified cheque made out to the Ministry of Finance.

Start with a question

Open a question to read the facts on file that bear on it.

  • When is vehicle approval or homologation required for a mobile crane?Nothing on file for Ontario answers this yet.

  • When is vehicle approval or homologation required for a concrete pump or drilling rig?Nothing on file for Ontario answers this yet.

  • Does a self-propelled vehicle passing through the jurisdiction need the same certification as one performing work there?Nothing on file for Ontario answers this yet.

  • Can temporary homologation cover a self-propelled vehicle entering for modification before sale?Nothing on file for Ontario answers this yet.

  • Who is qualified to sign the engineering certificate for a self-propelled crane?Nothing on file for Ontario answers this yet.

Facts

6 topics

Maximum gross vehicle weight (Measures)

The maximum total gross weight permitted for a vehicle or combination of vehicles, inclusive of load, on the applicable highway.

  • 63,500 kg139,993 lbAnnual Permits; Combination vehicles; overweight privileges may be granted
  • 70,000 kg154,323 lbProject Permits; Combination vehicles

Permit amendment allowed (Yes or no)

Whether an active permit can be amended after issuance.

Yesin 2 cases

  • An approved permit
  • Approved permit

Maximum rear overhang (Measures)

The maximum distance by which equipment or load may project beyond the rear of a vehicle or combination of vehicles, measured in metres.

4.65 m15′ 3″

Permit is issued for the movement of overlength

Permit type (In words)

The name or designation of the special hauling permit issued for the oversize or overweight movement, as stated by the issuing authority.

  • In general

    Annual

  • In general

    Project

  • In general

    Single Trip

  • In general

    Special Vehicle Configuration

Permit application lead time (Measures)

The minimum number of days before the proposed move date that a permit application must be submitted, as stated by the issuing authority.

  • 30 daysAnnual permit
  • 3 daysSingle trip permit; business days
  • 5 daysSuperload Permits

Permit renewal required before expiry (Yes or no)

Whether a permit with a time-sensitive start and end date must be renewed before the end date stated on the permit.

Yes

Annual, Special Vehicle Configuration and Project permits

Where these facts come from